Notes
- Maximum length of time equipment to be located at site is six weeks
- Liquidated damages will occur after time frame referenced in Note 1 above
- A risk assessment must accompany this application
- Once equipment has been removed from approved temporary storage location, the area must be left clean and tidy
- Appropriate barricade fencing to prevent general public access will be required to cordon off the area